§ Pricing

Transparent prices.
Honest budgets.

Every quote below includes architectural design, full permit filing, NFRC-certified windows, HCD-approved modules, and California-licensed construction. No hidden change orders.

§ 01 / ADU One-Stop

Three ADU paths, one accountable team.

Pick a footprint that fits your lot and your goal. Every plan is turnkey: design → permits → materials → construction → keys.

450 SQ FT · 1 BR / 1 BA

Studio

A refined independent space for singles, couples — or a premium home office.

  • Architectural design & structural set
  • Full CA permit filing & approval
  • HCD-approved prefab module
  • NFRC-certified windows & doors
  • Licensed construction & final inspection
$215K
Start this plan→
1,200 SQ FT · 3 BR / 2 BA

Estate

Three bedrooms, two baths. Maximizes rental yield and property appreciation on generous lots.

  • Everything in Family
  • Two full baths · island kitchen
  • Premium flooring & stone counters
  • Solar-ready electrical rough-in
  • Enhanced Title 24 performance
$445K
Start this plan→
§ 02 / Other Services

Windows & doors. Renovation. Permits.

Not every project is a full ADU. When you need a single premium window system, a kitchen renovation, or just a permit package — ZZA can do that too.

¶ A · Product

Windows & Doors

NFRC-certified thermal-break aluminum & German uPVC systems. 28 frame / glazing combinations. Supply-only or supply-and-install.

FROM$42/ sq ft
¶ B · Service

Renovation & Add-on

Kitchen, bath, full-house renovations and second-story add-ons. Same designers, same certified supply chain.

FROM$185/ sq ft
¶ C · Permit

Permit Package Only

Design, structural set, Title 24 report, and full CA permit filing — without construction. For owners working with their own builder.

FROM$14K
§ 03 / Fine Print

Everything else we get asked.

Q · 01

What is actually included in the price?

Architectural design, structural engineering, Title 24 report, full CA permit filing, HCD-approved modules or stick-built frame, NFRC-certified windows and doors, all interior finishes in the plan's finish schedule, licensed California construction, and final inspection. Site prep and utility hookups beyond 40 feet are quoted separately.

Q · 02

How long does a full ADU take?

Nine months from signed design contract to keys is our standard timeline: roughly 8 weeks of design & permits, 10 weeks of factory build, and 14 weeks of on-site assembly & finish. Complex sites add 2–4 weeks.

Q · 03

Do you handle the permit yourselves?

Yes. Full CA permit filing and back-and-forth with the local building department is included in every ADU plan and available as a stand-alone package. Our single-pass inspection record across 220+ permitted projects is one of the reasons clients choose ZZA.

Q · 04

What if my lot is unusual?

Use the project consultation to share your property needs. If your lot is outside our standard parameters, we'll schedule a site visit and provide a custom quote.

Q · 05

What's the warranty?

Ten-year structural warranty on all ADU work; two-year finish warranty on interior surfaces; manufacturer warranties pass-through on windows, doors, HVAC and appliances.

Ready when you are

Discuss a detailed quote for your project.

Start a conversation→

Indicative ADU planning budget

US$185,000–445,000

Reference figures from the original website’s different sizes and configurations. Actual costs may fall outside this range. Confirm design, permitting, site work, utilities, materials and finish inclusions for your project.

ZZA / CONSULTATION

Let's discuss your project.

Tell us your property ZIP Code, service needs and initial ideas. Include budget, property conditions and finish preferences if helpful.

Call Annie · +1 (669) 242-6338annie.wu@zzastudio.com

Start with a phone conversation or arrange a meeting at the property. Please confirm availability with Annie.

Enter the property's 5-digit ZIP. An exact address can be shared later.

Initial ideas are enough; unknown details can be discussed later. No exact address, ID or banking details are required.