Pillar 03 · Turnkey ADU

HCD-certified ADUs. Fixed price. 11–14 weeks.

Prefabricated modules built in our Sacramento factory. Delivered, craned, connected, and finished on your lot — with one contract and one warranty.

03
ADU-02 Meridian · Willow Glen, 2024
§ ShowroomShowroom

Six standard models.

Every model is customisable. These are our most-ordered configurations, all HCD-certified and R-1 compliant.

ADU-01
ADU-01from $199k

Atrium Studio

420 sqft · Studio · Detached

ADU-02
ADU-02from $269k

Meridian One-Bed

680 sqft · 1 BR · Detached

ADU-03
ADU-03from $365k

Courtyard Two-Bed

920 sqft · 2 BR · Detached

ADU-04
ADU-04from $185k

Garden JADU

480 sqft · 1 BR · Attached

ADU-05
ADU-05from $435k

Duo · Multi-Gen

1,100 sqft · 2 BR · Detached

ADU-06
ADU-06from $235k

Loft · Workshop

560 sqft · Studio+loft · Detached

§ Inside the moduleInside the module

Premium finishes, factory-precise.

Every interior is built under a dry roof — zero weather delay, millimetre tolerances, museum-grade finish.

§ ConfiguratorConfigurator

Build your estimate.

Sqft680 sqft
Bedrooms
Finish
Includes
  • Factory module
  • Site prep & foundation
  • Crane & install
  • Utilities hookup
  • Appliance package
  • Permit liaison
Estimate
$269,000

Fixed-price, turnkey, delivered to your lot in 11–14 weeks.

§ FAQFAQ
How long from signing to move-in?

Typical: 11–14 weeks. 4–6 weeks in factory (overlapped with permits); 2 weeks site prep; 1 week install; 2–4 weeks finish-out.

Can I finance an ADU?

Yes. We partner with three Bay-Area credit unions offering construction-to-permanent loans for HCD-certified modules.

What if my lot has a slope?

We handle it. Pier foundations are included in every quote up to 18" grade change.

Is the module code-compliant statewide?

Yes — HCD certification covers every California jurisdiction. No local building inspection required for the factory-built portion.